DMR Hydroengineering touches roof on getting work order worth Rs 1.48 crore
DMR Hydroengineering & Infrastructures is currently trading at upper limit of Rs. 180.25, up by 8.55 points or 4.98% from its previous closing of Rs. 171.70 on the BSE.
The scrip opened at Rs. 180.25 and has touched a high and low of Rs. 180.25 and Rs. 180.25 respectively. So far 3000 shares were traded on the counter.
The BSE group 'MT' stock of face value Rs. 10 has touched a 52 week high of Rs. 211.30 on 30-Jan-2024 and a 52 week low of Rs. 20.40 on 28-Feb-2023.
Last one week high and low of the scrip stood at Rs. 180.25 and Rs. 155.80 respectively. The current market cap of the company is Rs. 68.38 crore.
The promoters holding in the company stood at 72.78%, while Non-Institutions held 27.22% stake in the company.
DMR Hydroengineering & Infrastructures has received a work order worth Rs 1.48 crore plus applicable taxes on February 07, 2024 from Virtuaal Pareng Hydro for Detailed Design and Engineering Services of 14.50 MW Pareng Hydropower Project located in Arunachal Pradesh. The order is to be executed within 36 months.
DMR Hydroengineering & Infrastructures leverages Experience and Core Expertise in Design and Engineering to offer Concept to Commissioning services throughout the lifecycle of projects in infrastructure sectors.