Powered by: Motilal Oswal
01-01-1970 12:00 AM | Source: Accord Fintech
KP Energy gains on commissioning 25.2MW ISTS connected wind power project in Dwarka
News By Tags | #7182 #7428 #572

Follow us Now on Telegram ! Get daily 10 - 12 important updates on Business, Finance and Investment. Join our Telegram Channel

KP Energy is currently trading at Rs. 199.10, up by 0.25 points or 0.13% from its previous closing of Rs. 198.85 on the BSE.

The scrip opened at Rs. 199.95 and has touched a high and low of Rs. 201.80 and Rs. 196.50 respectively. So far 101482 shares were traded on the counter.

The BSE group 'B' stock of face value Rs. 5 has touched a 52 week high of Rs. 244.28 on 09-Sep-2022 and a 52 week low of Rs. 74.00 on 29-Jun-2022.

Last one week high and low of the scrip stood at Rs. 221.00 and Rs. 194.00 respectively. The current market cap of the company is Rs. 442.60 crore.

The promoters holding in the company stood at 44.80%, while Institutions and Non-Institutions held 0.06% and 55.14% respectively.

KP Energy has successfully commissioned 25.2MW (Phase-III) ISTS connected wind power project comprising 12 numbers of WTGs of 2.1MW each at Sidhpur site in Devbhoomi Dwarka. This Phase-III commissioning is a part of the 250.8MW ISTS connected wind power project capacity awarded to Apraava Energy bya Solar Energy Corporation of India (SECI) under Tranche-VIII bidding. 

With the present Phase-III commissioning the net cumulative capacity commissioned at Sidhpur site stands at 107.10MW (i.e. 52.5MW + 29.4MW + 25.2MW) against the awarded capacity 250.8MW. 

KP Energy is engaged in operating solar and wind energy projects in India.