Accumulate Jindal Steel and Power Ltd For Target Rs. 991 By Elara Capital
Accumulate Jindal Steel and Power Ltd For Target Rs. 991 By Elara Capital

Volume surprises on the positive

Jindal Steel and Power (JSP IN) Q4FY25 adjusted EBITDA stood at ~INR 24.8bn, ahead of our estimates of ~INR 22.3bn. Around 16% QoQ EBITDA growth was aided by robust volume growth of ~12% QoQ. Net debt declined to ~INR 119bn vs ~INR 136bn as on end-Q3FY24, led by ~INR 27bn QoQ reduction in working capital. As a result, net debt/EBITDA improved to ~1.3x vs 1.4x in Q3FY25. We expect healthy steel prices, up 6-7%, and lower coking coal cost (consumption cost down USD 10-15 per tonne) to support near-term margin. In the long term, successful completion of capacity and margin expansion projects and improved product mix will be key margin expansion triggers. Thus, we reiterate Accumulate with a TP of INR 991.

Higher volume cushions margin: Consolidated sales volume rose ~6% YoY and ~12% QoQ to ~2.1mn tonne, ~8% ahead of estimates, aided by higher production and inventory liquidation. Realization dipped ~8% YoY but was flat QoQ at INR 61,893/tonne. Operating cost declined ~8% YoY and ~1% QoQ to INR 50,241/tonne, driven by lower coking coal prices. Realization and operating cost were broadly in line with estimates. Consequently, EBITDA/tonne fell ~7% YoY but rose ~4% QoQ to INR 11,651 vs our estimate of INR 11,314.

Product mix to skewed toward flat steel: The share of flat steel rose to 42% in Q4FY25 vs 37% in Q4FY24 while it was 43% in FY25 vs 32% in FY24. As per management, JSP’s product mix is likely to shift meaningfully toward flat steel post completion of all projects with flat steel’s share rising 70% vs 43% in FY25.

BF-2 to come on-stream in Q1FY26. The first hot metal output from blast furnace (BF)-2 at its Odisha-based Angul plant is likely in Q1FY26. Also, basic oxygen furnace-2 at the same site is likely to be commissioned in Q2FY26. On the raw materials front, JSP has received mine opening permission for Utkal B1 coal mine in Odisha, which has a total reserve of ~148mn tonne and annual environmental clearance limit of 5.5mn tonne. This mine is set to start operations in H1FY26. Further, JSP has also secured Odisha-based Saradhapur Jalatap East coal block.

Retain Accumulate with a TP of INR 991: We expect lower coking coal prices, healthy steel prices and lower imports due to safeguard duty should support near-term performance. In the long run, phase-wise completion of announced capacity expansion projects, rising share of captive coal consumption and several cost savings measures would enable the company to keep a check on margin. Further, a healthy balance sheet with the lowest debt vs major peers despite ongoing capex is a key positive. Therefore, we reiterate Accumulate with a TP of INR 991. We retain our EBITDA estimates for FY26-27 and introduce FY28 estimates. We ascribe 6.0x March 2027E EV/EBITDA to the standalone business and 4.0x March 2027E EV/EBITDA to other business. Increased imports of low-cost material from China and other countries, unprecedented rise in coking coal & iron ore prices, and demand slowdown from key end-user industries are key risks to our call.

 

Please refer disclaimer at Report
SEBI Registration number is INH000000933

Disclaimer: The content of this article is for informational purposes only and should not be considered financial or investment advice. Investments in financial markets are subject to market risks, and past performance is not indicative of future results. Readers are strongly advised to consult a licensed financial expert or advisor for tailored advice before making any investment decisions. The data and information presented in this article may not be accurate, comprehensive, or up-to-date. Readers should not rely solely on the content of this article for any current or future financial references. To Read Complete Disclaimer Click Here