10-11-2021 03:13 PM | Source: Reuters
Indian Oil defers maintenance shutdown of units at Haldia - sources
News By Tags | #813 #6824 #412

Follow us Now on Telegram ! Get daily 10 - 12 important updates on Business, Finance and Investment. Join our Telegram Channel

https://t.me/InvestmentGuruIndiacom

Download Telegram App before Joining the Channel

NEW DELHI - Indian Oil Corp has deferred a maintenance shutdown at the 160,000 barrel-per-day (bpd) Haldia refinery by at least 15 days to mid-November to meet higher local fuel demand during the festival season, two sources familiar with matter said.

The country's top refiner had planned to shut an about 80,000 bpd crude unit and some secondary units at its eastern India plant from Nov. 1, they said.

The refiner plans to shut a crude unit and a vacuum distillation unit for 40 days, a fluidised catalytic cracker for 50 days and a diesel hydro desulphuriser for 25 days, one of the sources said.

Haldia refinery has two crude and vacuum distillation units.

This source said the shutdown has been deferred to meet higher demand for gasoil and gasoline during the festival season.

The company did not immediately respond to a request for comment.

India's busy festival season begins this month, with several celebrations dotting the calendar until November, when the Hindu festival of lights, Diwali, celebrated by millions, takes place.

 

(Reporting by Nidhi Verma; Editing by Kirsten Donovan)