08-08-2023 11:37 AM | Source: Accord Fintech
ARSS Infrastructure Projects touches roof on receiving work order of Rs 15.41 crore
News By Tags | #3519 #483 #572

Follow us Now on Telegram ! Get daily 10 - 12 important updates on Business, Finance and Investment. Join our Telegram Channel

https://t.me/InvestmentGuruIndiacom

Download Telegram App before Joining the Channel

ARSS Infrastructure Projects is locked at its upper circuit limit of Rs. 19.53, up by 0.93 points or 5.00% from its previous closing of Rs. 18.60 on the BSE.

The scrip opened at Rs. 18.90 and has touched a high and low of Rs. 19.53 and Rs. 18.90 respectively. So far 3292 shares were traded on the counter.

The BSE group 'T' stock of face value Rs. 10 has touched a 52 week high of Rs. 27.51 on 27-Mar-2023 and a 52 week low of Rs. 16.68 on 01-Jun-2023.

Last one week high and low of the scrip stood at Rs. 19.90 and Rs. 18.32 respectively. The current market cap of the company is Rs. 44.41 crore.

The promoters holding in the company stood at 46.70%, while Non-Institutions held 53.30% in the company.  

ARSS Infrastructure Projects has received work order of Rs 15.41 crore for Construction of Reinforced earth (RE) Wall (designed for 100 years life) for approach of ROB?542 & 489A at Railway Km.206?370 and Km.180.380 including allied items between Purunakatak (Km.180) and Boudh (Km.207.0) of Khurda Road?Bolangir new BG Rail Link project of E.Co. Railway from Office of the Dy. CE/C/Boudh ECOR?CONST?HQENGG CAO/ CON/ ECOR, 2nd Floor, North Block, Rail Sadan, Samanta Vihar, Chandrasekarpur Bhubaneswar, Odisha.