Sell Rail Vikas Nigam Ltd For Target Rs.153 by Prabhudas Liladhar Capital Ltd
RVNL reported a mixed Q2FY27, with consolidated revenue of INR 47.0bn (-8.2% YoY, 17% below our estimate) but EBITDA up 21.7% YoY to INR 2.6bn as margin expanded to 5.62% from 4.23% in Q2FY26. PAT rose 8.2% YoY to INR 2.5bn, helped by a lower tax rate and higher JV profit despite a 36% fall in other income. Order book stood at INR 901.0bn as on 30 September 2026 (~4.4x TTM consolidated revenue), down 3.6% QoQ, with H1 inflow of INR 71.3bn against a lowered FY27 target of INR 200–250bn. Management cut FY27 guidance to ~10% revenue growth (FY27 revenue of ~INR 220– 230bn) and 8–10% PAT growth, from ~15% and 15–20% earlier, while raising its core EBITDA margin target to 6–7%. With H1 revenue flat YoY, even the revised guidance needs ~19% YoY growth in H2. We cut FY28E/FY29E revenue by 13%/6% on slower execution and inflows, but raise EBITDA by 1%/12% and EPS by 4%/12% as we build in higher margins (~4.7–4.8% vs ~4.0% earlier). The stock trades at a rich ~38x FY28E EPS. We maintain SELL with a revised SOTP-based target price of INR 153/share (from INR 165), as we roll forward to 1HFY29E and value the core EPC business at 30x core EPS (excluding other income), plus INR 12.6/share for railway subsidiaries and JVs and INR 9/share of cash.
Margin-led quarter:
RVNL posted consol revenue of INR 47.0bn (down 8.2% YoY, +8.8% QoQ), which management attributed to monsoon, geopolitics and a project closure in Saudi Arabia. EBITDA rose 21.7% YoY (+43.0% QoQ) to INR 2.6bn, with margin at 5.62% versus 4.23% YoY and 4.27% QoQ; EBITDA was 6% above our estimate. PAT rose 8.2% YoY (+56% QoQ) to INR 2.5bn (EPS INR 1.20), despite other income declining 36% YoY to INR 1.3bn, aided by the effective tax rate falling to 22.0% (-1,060bps YoY) and share of profit from JVs/associates rising 27% YoY to INR 304mn. For H1FY27, revenue was flat at INR 90.2bn, EBITDA rose 62% YoY to INR 4.5bn (margin 4.97% vs 3.06%) and PAT 12% YoY to INR 4.1bn. Operating cash flow turned positive at INR 5.9bn in H1 (vs -INR 12.5bn in H1FY26), and net debt fell to INR 32.1bn from INR 38.5bn at FY26-end.
Order book moderates further:
Order book stood at INR 901.0bn as on 30 September 2026 (~4.4x TTM consolidated revenue), down from INR 934.9bn in Q1FY27 and INR 992.6bn at FY26-end, as Q2 inflow (implied INR 13.1bn) trailed execution. Segment-wise, railways dominate at INR 568.2bn (63%), followed by signalling INR 122.2bn (14%), metros INR 53.5bn (6%), power & transmission INR 38.8bn (4%), roads/highways INR 30.4bn (3%) and hydro/irrigation INR 18.0bn (2%), with building, port, BharatNet and others at INR 69.9bn (8%). H1 wins included NMDC (~INR 38.7bn), Indian Railways roadbed and bridge works (~INR 19.5bn) and an SJVN siding for the Buxar thermal project (~INR 9.0bn). Management expects ~INR 100bn of awards in the next one to two months, but its bidding win rate is only 7–10%.
International push and project execution:
RVNL has pre-qualified for the Tel Aviv metro (eight packages of ~INR 200bn each; RVNL share ~INR 100bn per package if won) and a ~INR 120bn railway project in Serbia, both with JV partners, but management does not expect these to be awarded this year. It is L1 on a ~INR 2.2bn grant project in Sierra Leone and is targeting Ghana and other African markets, while closing the Kyrgyzstan JV and the South Africa subsidiary. On domestic projects, the first Vande Bharat Sleeper prototype has slipped to March–June 2027 (vs December 2026 in the PPT, which management called an error), though the overall 120- set delivery timeline is retained. Rishikesh–Karnaprayag (INR 370bn) is 79% complete with ~97% tunnelling done, targeted for December 2029.
Please refer disclaimer at Report
SEBI Registration number is INH000000933
