LCC Projects inches up on winning Rs 151.57 crore EPC contract from Government of Gujarat
LCC Projects is currently trading at Rs 136.20, down by 0.05 points or 0.04% from its previous closing of Rs. 136.15 on the BSE.
The scrip opened at Rs. 136.90 and has touched a high and low of Rs. 138.55 and Rs. 135.60 respectively. So far 12887 shares were traded on the counter.
The BSE group 'B' stock of face value Rs. 5 has touched a 52 week high of Rs. 191.90 on 17-Sep-2026 and a 52 week low of Rs. 132.65 on 15-Oct-2026.
Last one week high and low of the scrip stood at Rs. 145.95 and Rs. 132.65 respectively. The current market cap of the company is Rs. 3939.53 crore.
The promoters holding in the company stood at 89.90%, while Institutions and Non-Institutions held 4.84% and 5.26% respectively.
LCC Projects has received an Acceptance of Tender (AoT) worth Rs 151.57 crore (excluding GST) from the Office of the Executive Engineer, Sauni Yojana Division, Rajkot, Government of Gujarat. The AoT is for engineering, procurement and construction (EPC) contract for supply water from Machhu-I Dam to Triveni Thanga Reservoir and various villages of Wankaner and Chotila Taluka. The project construction period is 24 months, with operation and maintenance of the commissioned project for 10 years.
